Why this page exists
Damage inspection only helps when the unit ID is already right.
The operational problem is not just finding dents or creasing. It is proving that the damage note belongs to the correct container after the survey, interchange, or depot handoff is over.
What PrefixCheck adds
Identity first, condition second.
- Confirm the owner prefix and container number first.
- Carry the operator into damage review without switching records.
- Keep the same unit context for notes, photos, and inspection detail.
Related page
Need the depot workflow too?
Container damage inspection is usually paired with yard and depot operations.
Open depot operations page